Checklist before HVAC installation.
1) Manual J Calculation is used to calculate actual load requirement of the room area.
2) Windows, pass box area, doors, lamps, machines, human should be included in the calculation of rooms.
3) Check all the equipment are calibration and energy efficient.
4) Check all construction of civil work, mechanical work, structure.
Checklist during HVAC system.
1) All joints of ducts should be insulated, sealed properly to avoid the air leakage and temperature loses.
2) Thermostats, Temperature sensor, Valve, magnehalic gauge, DP should be checked and calibrated.
Checklist after HVAC installation.
1) Get the Operation manual, Warranty Card, Drawings, installation procedure manual, maintenance agreement from the manufacturer.
2) Validate the area for temperature and relative humidity, HVAC system tests.
6) Area should be validated for non viable and viable particle count.
7) Check integrity for all HEPA (High efficient particulate air) filter located in the clean room areas.
8) Check ACPH (air change per hour) for all rooms for each class.
Comments
Post a Comment